Project: Interior Fit-Out, Completion and Renovation Works for the 5th floor of
Heydar Aliyev International Airport Terminal 2
Location: Baku, Azerbaijan
Work Description:
• Total area 2300 m2 interior fit-out and finishing works; design, layout, installation, refurbishment, and completion of architectural elements; execution of mechanical, electrical, and HVAC works; installation of power, lighting, low-current, fire alarm, and life safety systems; testing, commissioning, and system integration.