Project: Refinery Turnaround (TAR) Service contract
Location: Heydar Aliyev oil refinery. Baku, Azerbaijan
Work Description:
• 12 km associated piping laying, pumps, steam and condensate, closed drain, nitrogen blanketing, electrical, instrumentation, civil and structural works, reconstruction of the Flare Line, demolition of unnecessary existing structures and 43 pcs hazardous tanks (3000m3), and all required tie-ins to process, utility, fire-fighting, drainage, electrical, and control systems.