• Project: Maintenance of waste sorting equipment (sandblasting, painting, testing)
• Status: Since 05.2023 – Ongoing
• Project: Maintenance of: HVAC system, Fire Alarm system, Generators, Gas tank device
• Status: Since 11.2022 – Ongoing
• Project: Maintenance of reverse osmosis system (water purification unit)
• Status: Since 07.2023 – Ongoing
• Project: Technical maintenance of scales
• Status: Since 08.2023 – Ongoing
• Project: Installation of conveyor belt, Sandblasting and painting of diesel tanks and reservoirs, Installation of a new waste sorting line, Manufacturing and installation of containers
• Status: Since 08.2023 – Ongoing
• Project: Grouting of equipment, Overhaul of dry waste press equipment “One tech essener strabe 13/49716 Meppel-Huntel”
• Status: 02.2023 – Completed
• Project: Supply of conveyors for solid domestic waste plant
• Status: 04.2023 – Completed
• Location: Karabakh, Azerbaijan
• Project: Supply of special heavy machinery for use in the Karabakh and East Zangezur economic regions